1. Geo-economic Survey:
Evaluation of products viable for transportation from villages to markets.
Considerations include road conditions, vehicle specifications, safety, volume, price, transport distance, time, shelf life, customer base, tax regulations, and local support services/materials.
Assessment of the potential number of villages for installations and the weight and valuation of transported products.
2. Engineering:
Establishment of a design and development center for e-bikes, solar panels, battery banks, generators, and enclosure structures.
Parameters such as charge time, capacity, shipment volume/weight per station, and costs are detailed.
Demonstration of proof of concept, feasibility study, and prototype construction at the development center.
3. Investment in SG Development Center:
Rental of engineering company premises and staff.
Acquisition of solar panels, generators, battery banks, and e-bikes with trolleys.
Implementation of payment token system for programming and management.
4. SG Development Center - Village Station Design:
Design considerations for flat pack shipment, assembly on-site, use of imported and local materials, e-bike assembly with trolleys, spares/tools for repair, training manuals, and token reader interface.
5. Project Phases:
Planned phases include SG development, pilot deployment at one TL site, operational trials/data collection, and subsequent installations.
Detailed expenses, revenue projections, equipment/materials/construction costs, maintenance, and monthly revenue are outlined.